CS-2024-0142 Acquisition EngineeringReview · edit-lock pending CR-006: engineeringQuantityTakeoff × verifiableUnitCostFromSourceDocument
Westgate Logistics — engineering take-offs
Review AI-generated quantity measurements from the A-101 drawings and FF&E invoices. Adjust line items in place; every line must reference a verifiable source document. Route-forward applies an edit-lock and notifies Saanvi Iyer (Tax Analyst).
Total line items
348
312 AI · 36 engineer-added
Engineer-adjusted
62
17.8% of line items
Σ extended cost
$14,798,420
δ vs. basis: $1,580 (CR-002)
Source coverage
100%
All items reference source docs
Component line items
Hybrid workflow · AI initial pass + your edits
All
AI
Adjusted
Engineer-added
Below 70 conf
DescriptionQtyUnitUnit costExtendedSourceConf
Decorative wall sconcesAI
Lobby + corridor — proposed 5-yr
$26,199 FFE-Invoice-0042 · pg 3 94
Site paving — heavy dutyEDITED
Whiteco analysis pending — 15-yr
$395,240 A-101 · sheet C-200 68
Loading dock levelersAI
7-yr personalty
$170,400 AIA G703 · line 14 96
Tenant signage — pylonEDITED
Whiteco factor 4/6 → 5-yr
$55,200 A-101 · sheet C-105 62
HVAC — RTUs (×8)AI
Building-essential — stays 39-yr
$182,400 AIA G703 · line 23 98
Decorative landscaping — palm treesEDITED
Engineer-added · 15-yr land imp.
$43,680 FFE-Invoice-0066 76
Specialty electrical — server roomAI
Tenant-specific · 5-yr personal
$84,200 AIA G703 · line 31 91
Sprinkler systemAI
Stays §1250 · 39-yr
$373,760 A-101 · sheet M-100 94
Tenant carpet — luxury vinyl tileAI
5-yr personalty
$53,960 FFE-Invoice-0089 92
Office partitions — demountableAI
7-yr personalty (HCA)
$86,800 AIA G703 · line 18 88
Showing 10 of 348 line items · use ⌘K to jump
A-101 Construction Drawings · sheet C-200 · page 38 of 142 linked to row 2
SHEET C-200 · SITE PAVING PLAN
Drawing scale 1" = 30'-0" · Issued for construction 02/14/2022
▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢
▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢
▢▢▢▢ HEAVY-DUTY ASPHALTIC CONCRETE PAVING — 48,200 SF @ 8" THICK ▢▢▢▢
▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢▢
Notes:
1. All paving to be 8" PCC over 12" CMB.
2. Unit cost $8.20/SF includes mat'l + labor + sealcoat.
3. Quantity verified against AIA G703 line 7 ($395,240 total).
AIA G703 · APPLICATION FOR PAYMENT — LINE 7
Item: Site paving — heavy duty
Scheduled value: $395,240
Work completed to date: 100%
Retainage: 5% ($19,762)
Balance to finish: $0
Route-forward gate (A-015): when you're satisfied, this transitions EngineeringReview → InReview, applies the edit lock, and pushes a notification to Saanvi Iyer (Tax Analyst) via DF-014.
Continue to Classification Tool →